Stage 2: Pre-Migration Health Check for SAP ECC → S/4HANA

The SI is under contract. ECC isn't ready. A 60–90 day health check before blueprinting kicks off — custom code inventory, integration mapping, data quality audit, transport pipeline stabilization, and environment-specific runbook creation. Ring-fence production at low cost, before the migration clock starts consuming your team's attention.

This page is part of allari.com. The full interactive experience is available at https://allari.com/ecc-journey/health-check.

About Allari. The ERP Lifecycle Partner. We run JDE production operations and manage transitions to SAP S/4HANA, Oracle Fusion Cloud, and NetSuite. Founded 1999. 27 years of continuous operation. Self-funded. Zero debt. Zero exits. We recover 38.4% of lost IT execution capacity through co-managed ERP operations and the Build-Run Separation.

What Allari runs

  • Run. Tickets, escalations, patches, environment issues, vendor noise — every reactive workload, fully owned.
  • Build. Your team gets 100% of their time back for the roadmap. Migrations, modernization, automation.
  • Transition. JDE → SAP, JDE → Oracle Fusion, JDE → NetSuite. Operational continuity through 18–36 month projects.

Verified outcomes

  • 38.4% capacity recovered (HellermannTyton, 27-month study)
  • Average ticket resolution: 16 days → 1.77 days
  • 82% ticket aging reduction
  • 19% Year-1 TCO compression
  • 92% on-time delivery across 62 Fortune 500 engagements

Book a working session · How the Allari engine works · Research library